Ventura House Renovation
Status: In progress — targeting move before end of 2026
A major whole-house remodel of the future Ventura home. Gordon did all the architectural design himself.
Scope:
- Complete interior remodel
- 5 shear walls
- 7 underpins
Plan after move: Exterior work remains, including the back deck, side yard stairs, back yard hardscape, and other items. The interior must be done before they can move in.
Related renovation notes:
- Entry portico repair / renovation — problem summary, recommended direction, and decisions TBD for the front entry post-and-beam repair.
Architectural plan: View on Google Drive